Reference · Machinery · Data platform
One set of numbers for the whole group
An EU-hosted data platform brings together the ERP, CRM, MES and Excel planning of a machinery group — with binding KPI definitions, automated quality checks and month-end reporting that is ready after two working days instead of six.
| Before | After | |
|---|---|---|
| Month-end reporting | 6 days | 2 days |
| Manual reconciliation | 38 h/week | 6 h/week |
| Data latency | 24 h | 1 h |
Outcome
6 → 2
working days to month-end reporting
measured over the first three month-end closes in production
−84%
manual data reconciliation
from 38 to 6 hours per week across controlling, sales and plant controlling
64
KPIs with a binding definition
reduced from 212 KPI names in old reports, each with formula, source field and owner, signed off by controlling
24 → 1 h
data freshness
figures from ERP, CRM and MES available hourly instead of the next day
Starting point
The group grew through acquisitions. The four companies now post in a shared ERP with separate company codes, but alongside it ran a CRM in sales, MES systems in two plants and a large number of Excel files for planning and analysis — and each company brought its own reporting habits. Every department had its own numbers: sales counted order intake when an order was entered in the CRM, controlling when it was confirmed in the ERP.
The monthly management report was only ready on the sixth working day after month-end, and controlling spent most of that time reconciling exports. Across all departments, around 38 hours a week went into manually merging and checking data. Figures were usually a day old, and the management meeting spent more time on which number was right than on the decision that should follow from it.
Mandate
Wendix was engaged to build a central data platform — from the KPI inventory to handing over production operations to the internal BI team. Agreed acceptance criteria: month-end reporting by the third working day at the latest, a deviation below 0.5% from the approved closing figures in two consecutive month-end closes, every KPI in the glossary with a named owner, operation in the EU and a role model approved by data protection.
Cleaning up master data in the source systems, statutory group consolidation and a new planning tool were out of scope. Master data cleanup is planned as a second stage; consolidation stays in the existing system.
Approach
Step by step to the result
- 01
Discovery and KPI inventory
Interviews with controlling, sales, production and IT. We collected every recurring report, traced its figures back to the source systems and measured where the time goes during month-end close.
Deliverable: KPI inventory, target architecture and acceptance criteria
Week 1–3
- 02
KPI glossary and data contracts
In weekly definition sessions with controlling, 212 KPI names from existing reports were reduced to 64 binding definitions — each with formula, source field, cut-off logic and a business owner. For every source system we agreed a data contract with the responsible system owner.
Deliverable: KPI glossary signed off by controlling, data contracts for ERP, CRM and MES
Week 3–7
- 03
Platform build and integration
Platform in the EU cloud (Frankfurt), fully defined as infrastructure as code. ERP, CRM and MES connected via change data capture or hourly extracts, with raw, cleaned and business layers. Excel planning now arrives through a validated upload instead of by email.
Deliverable: Monitored hourly pipelines for three source systems and planning
Week 5–12
- 04
Semantic layer and dashboards
The 64 KPIs were modelled once, centrally. On top of that, dashboards for management, sales, plant management and controlling were built with the business teams in two-week iterations. Excel connects live to the same definitions.
Deliverable: Semantic layer and eleven dashboards, every KPI linked to the glossary
Week 10–16
- 05
Parallel run, acceptance and handover
Two month-end closes ran in parallel on the old and the new path. Every deviation was traced back to the source row and explained. Then the old Excel reports were switched off, the data owners trained and operations handed over to the internal BI team.
Deliverable: Acceptance based on two reconciled month-end closes, runbook
Week 15–20
Solution
Architecture and delivery
01
Source systems
ERP, CRM, MES, Excel planning
02
Ingestion
Change data capture, hourly loads
03
Lakehouse
Raw, cleaned, business — hosted in the EU
04
Semantic layer
64 KPIs from the agreed glossary
05
Business teams
Dashboards and Excel on the same numbers
- Medallion architecture: raw data is kept unchanged, cleaned in the cleaned layer and condensed into business models in the business layer. Every figure on a dashboard can be traced back to its source row.
- Data contracts per source system define schema, mandatory fields and freshness. A breach stops the affected load and goes to the responsible data owner — instead of silently delivering wrong numbers.
- Around 340 automated quality checks run on every load, from duplicates and broken references to plausibility limits. The results are visible to all business teams on a dedicated quality dashboard.
- A semantic layer defines each KPI exactly once. Dashboards and Excel analyses use the same definition; copies with their own formula no longer exist.
- GDPR-compliant role model: access by company and function, personal CRM data pseudonymized, shift data from the MES only in aggregate. Operated entirely in an EU data center (Frankfurt).
Technology
Methodology
How we worked
Data contracts
Binding agreements between source system and platform on the structure, meaning and delivery time of the data. Changes in the ERP surface before month-end close, not after it.
KPI glossary with controlling
Every KPI gets a formula, source field, cut-off logic and a business owner. Controlling signs off — only then is it modelled.
Medallion architecture
Three clearly separated layers (raw, cleaned, business) keep errors contained and make recalculation possible at any time without loading the source systems again.
Automated data quality checks
Checks are part of every transformation and versioned like code. Anything that fails a check never reaches a dashboard.
Data ownership and GDPR role model
Each domain has a named business owner; access rights follow company and function. The role model was agreed with data protection and the works council.
Insights
What we take away
- 01The bottleneck was agreeing on definitions, not the technology: order intake existed in four variants, and settling it took longer than connecting the ERP.
- 02Don't ban Excel, connect it: business teams that can point their pivot tables straight at the semantic layer switch over on their own.
- 03Running two month-end closes in parallel builds the trust no architecture diagram can — especially since most deviations turned out to be errors in the old reports.
More references
You might also be interested in
Industry · Resilience
From untested backups to a rehearsed recovery
An automotive supplier brings its ERP back after a simulated total outage in four hours instead of 72, measured in a test — with immutable backups, a recovery plan agreed with management and restores rehearsed every quarter.
72 h → 4 hERP recovery time (RTO), tested
Automotive · Document capture
Mill certificates nobody types anymore
AI-based document capture reads an automotive supplier's delivery notes, mill certificates and inspection reports, checks them against purchase orders and master data in the ERP, and only puts exceptions in front of a person.
−78%handling time per document
Next step
Ready to put digitalization into practice?
Start with a compact digitalization assessment — clearly scoped, no long-term commitment.