An automotive supplier brings its ERP back after a simulated total outage in four hours instead of 72, measured in a test — with immutable backups, a recovery plan agreed with management and restores rehearsed every quarter.

Starting point before the projectAcceptance test and first year of operation
72 h4 hERP recovery(RTO)24 h1 hERP dataloss (RPO)0 tests4 testsRestore testsper year
Measured in the recovery test: ERP recovery time and data loss (hours), restore tests per year
Measured in the recovery test: ERP recovery time and data loss (hours), restore tests per year
Starting point before the projectAcceptance test and first year of operation
ERP recovery (RTO)72 h4 h
ERP data loss (RPO)24 h1 h
Restore tests per year0 tests4 tests

Outcome

  • 72 h → 4 h

    ERP recovery time (RTO), tested

    measured in the recovery test: ERP usable again with database, interfaces and label printing; RTO target from the BIA and acceptance criterion: 8 hours

  • 24 h → 1 h

    maximum ERP data loss (RPO), tested

    hourly log backups of the ERP database instead of one nightly backup, restored up to the last recovery point in the test

  • 4 of 4

    quarterly tests passed in the first year

    a different scenario each time, most recently ransomware with recovery solely from the immutable copy

  • 0 → 23

    documented runbooks

    for every system in criticality tiers 1 and 2, with sequence, dependencies and verification steps

Starting point

One of the client's suppliers was hit by ransomware and could not deliver for two weeks. Management then asked IT a simple question: how long would we be down if it happened to us? There was no reliable answer. Backups ran every night and reported success, but a full ERP restore had never been rehearsed — the estimate was "several days".

Without the ERP, production planning, shipping and label printing stop, and the vehicle manufacturers expect deliveries on schedule. The backups sat on a NAS in the same domain as the production systems and would have been encrypted along with them in an attack. At the same time, customers were asking about recovery capability in supplier audits, and the company falls under NIS2 as an important entity.

Mandate

Wendix was engaged to establish demonstrable recovery capability — from the business impact analysis to a passed test. Agreed acceptance criteria: ERP recovery within eight hours and no more than one hour of data loss, both measured in a test, at least one immutable copy separated from the production network, runbooks for every critical system, and a test carried out by the client's own administrators.

A second data center with hot standby, segmentation of the production (OT) network and round-the-clock monitoring by a SOC were out of scope; OT segmentation is planned as a separate project.

Approach

Step by step to the result

  1. 01

    Inventory and baseline test

    Inventory of all servers, applications, backup jobs and their dependencies. Then a first full ERP restore into an isolated environment: it took 72 hours — mainly because the license server, Active Directory and credentials were missing; on top of that, the restore ran from a NAS at only 1 Gbit/s.

    Deliverable: System inventory with a dependency map and a measured baseline for ERP recovery

    Week 1–3

  2. 02

    Business impact analysis with management

    Workshops with management, production, logistics and finance. For every business process we set the maximum tolerable downtime and derived recovery time and data loss targets per system — justified by delivery commitments to customers, not by technology.

    Deliverable: RTO/RPO targets signed off by management and three criticality tiers

    Week 2–5

  3. 03

    Backup architecture following 3-2-1-1-0

    Hardened backup repository at the second plant, an immutable copy with Object Lock in an EU data center, backup administration in a separate domain with MFA. Hourly log backups for the ERP database and automatic recoverability checks on every backup.

    Deliverable: Production backup architecture with an immutable copy separated from the production network

    Week 5–10

  4. 04

    Recovery plan and runbooks

    Emergency manual following BSI Standard 200-4 with crisis team, reporting channels and a recovery sequence taken from the BIA. 23 runbooks for the critical systems, written so that an administrator can work through them without asking anyone; credentials in an emergency vault with an offline copy.

    Deliverable: Emergency manual, 23 runbooks and an emergency folder available offline

    Week 8–13

  5. 05

    Recovery test, NIS2 review and acceptance

    Full recovery test from the hardened repository into the isolated environment, carried out by the client's administrators using nothing but the runbooks. In parallel, a review against the NIS2 obligations: registration, a reporting process with deadlines of 24 hours, 72 hours and one month, training for management.

    Deliverable: Test report with measured RTO/RPO, NIS2 action plan and a calendar for four quarterly tests

    Week 13–16

Solution

Architecture and delivery

  1. 01

    Production systems

    ERP, file server, Active Directory, MES

  2. 02

    Primary backup

    hardened repository at the second plant

  3. 03

    Immutable copy

    Object Lock, 30 days, EU data center

  4. 04

    Isolated environment

    restore and checks with no link to production

  5. 05

    Recovery

    by runbook, sequence from the BIA

  • 3-2-1-1-0: three copies on two media types, one of them off-site, one immutable and separated from the production network, zero errors in the automatic recoverability check.
  • The backup infrastructure has its own accounts, its own domain and MFA. Whoever takes over the production domain can neither delete nor encrypt the backups.
  • Recovery sequence from the business impact analysis: identities and network first, then ERP and shipping, then file servers and reporting.
  • Instant recovery for the ERP straight from the repository at the second plant over a 10 Gbit/s link — data moves back in the background while the system is already running.
  • Quarterly recovery tests with changing scenarios, with the results reported to management as a key figure.

Technology

Hardened Linux backup repositoryObject storage with Object Lock (EU)Separate backup domain with MFAIsolated recovery environmentPassword vault with offline copyMonitoring

Methodology

How we worked

BSI Standard 200-4 (business continuity management)

Provides the structure for the emergency manual, crisis team and recovery planning. We started at the reactive BCMS level and scaled the framework to a mid-sized company instead of producing every document the standard describes.

Business impact analysis

Management decides the maximum tolerable downtime (MTD) of each process and how much data loss is acceptable. Only then is it clear which technology is needed — and where nightly backups remain good enough.

3-2-1-1-0 rule with immutable backups

Extends the classic 3-2-1 rule with an immutable copy and zero errors in recoverability checks. Against ransomware, that copy is what decides the outcome.

Quarterly recovery tests

A backup only counts once its restore has been rehearsed. Every test measures RTO and RPO and ends with corrected runbooks.

NIS2 gap analysis

Review against the obligations of the German NIS2 implementation act: registration with the BSI, reporting deadlines, risk management and management accountability. The result is a prioritized action plan.

Insights

What we take away

  1. 01In the baseline test the bottleneck wasn't restoring the data but everything around it: the license server, Active Directory and credentials that were stored only in the system that had failed.
  2. 02Recovery targets hold up when management derives them from the consequences of a standstill — not when IT estimates them.
  3. 03A recovery test only counts when it is run by someone who didn't build the system. That is when the gaps in the runbooks show.